Downstream
Day In Life Of - Time-on-Tools Optimization
23–56% wrench time on tools
Examples of in-depth engagements · five sectors · measurable, verified outcomes
Downstream
23–56% wrench time on tools
Petrochemical
~80% self-serve contracting
Upstream
~35% CAPEX compression
LNG & Midstream
40–60% faster repair
LNG
15 MTPA startup readiness
Upstream
zero single points of failure
Deepwater
~30% lower value burn
Regas & Wind
30% leaner inventory
Assess & address the key control points in your supply chain below.
Supply strategy linked to business strategy, creating and capturing value.
Talent, mindset and brilliant basics that make performance repeatable.
Single-source-of-truth data, AI insight and resilience that protect value.
Contract drift — value leaks from strategy to award to implementation. The systemic break sits at Source & Award, compounded by weak demand management upstream and poor contract management post-award.
| Pre-Award | Post-Award | ||||
|---|---|---|---|---|---|
| Strategic Contracts | Assess Demand | Category Strategy | Source & Award | Mobilize & Implement | Manage & Realize |
Gas Turbine CSA Ref: CW-6x |
~ | + | ~ | + | ~ |
Drilling & Completions Services Ref: CW-5x |
+ | ~ | + | + | ~ |
Maintenance Services Ref: CW-4x |
− | + | − | + | − |
Vessels Ref: CW-2x |
+ | − | − | + | + |
Waste Management Ref: CW-3x |
~ | − | − | − | − |