Scope, Risk & Value
Clients / Case Studies / Scope, Risk & Value Review
Upstream
Value Preservation
Case Study · In Depth
Scope, Risk & Value Review
A capital project was stalled in front-end planning, with scope and risk allocation still unresolved months past the original gate date.
The Challenge
Stalled
Capital tied up, timeline slipping, and no shared view between owner and contractor on where the real risk actually sat in the scope.
Our Approach
5-Day, Fast-Tracked
We ran a structured, fact-based scope and risk review in five days — pressure-testing assumptions, reallocating risk to whoever could actually control it, and clearing the path to sanction.
The Result
~35%
CAPEX efficiency improved by roughly a third versus the original plan, and the project moved from stalled to sanctioned.
